McCoys Creek Phase 1

Phase-1-Graphic

Phase I of the project, from Leland Street to Myrtle Avenue, includes permanently closing and removing a low-lying section of McCoys Creek Boulevard. Construction will begin by early 2021.

McCoys-Aerial-with-Label

Foot bridge along the Emerald Trail

Conceptual design of King and Stockton Street bridges. Bridges will be raised and reconstructed with sidewalks, bike paths and railings that honor the current iconic design. Click image to enlarge.

Cul-de-sacs with new trees, landscaping, lighting and sidewalks will be constructed at the end of Sunshine, Leland, Crystal, Smith and Broward streets where they now intersect with McCoys Creek Boulevard. Click image to enlarge.

Lastly, the Emerald Trail will be constructed along McCoys Creek connecting the North Riverside neighborhood to downtown as well as the St. Johns River and other historic urban neighborhoods. Click image to enlarge.

Conceptual design of cul-de-sac
Conceptual design of cul-de-sac